Search
Close this search box.

Emerson Rosemount 3308 Wireless Level Transmitter – Guided Wave Radar

The Rosemount 3308 Wireless Level Transmitter enables automation of level and interface measurements in previously inaccessible locations. Cost savings of up to 60% can be realized by automating the processes that you have not been able to automate before. The Rosemount 3308 offers several advantages like easy installation without wiring, no calibration, and immunity to changing process conditions. With remote access to process data and enhanced diagnostics for predictive maintenance, visual inspections are a thing of the past.

GET INSTANT QUOTE

    FEATURES

    Product Details

    Description

    Features

    • Direct Switch Technology gives increased sensitivity, high reliability, and long battery life
    • Signal Quality Metrics offers you the ability to work proactively with your level instrumentation
    • Native wireless can give you a better overview of your plant by automating applications that you have not been able to automate before

    Specifications

    Specifications

    Accuracy
    ± 0.12 in. (3 mm)
    Repeatability
    ± 0.08 in. (2 mm)
    Measurement Range
    Up to 56 ft (17 m)
    Operating Pressure
    Full vacuum to 580 psi (Full vacuum to 40 bar)
    Operating Temperature
    -40 to 302°F (-40 to 150°C)
    Communication Protocol
    WirelessHART®
    Battery Life
    9 years @ 1 min update rate
    Diagnostics
    Enhanced diagnostics which enables proactive maintenance
    Probe Types
    Rigid single lead, Segmented single lead, Flexible single lead, Coaxial, PTFE coated probes

    Documents

    Documents

    Accessories

    Accessories

    JUHE FUTURE INTERNATIONAL LIMITED

    specializes in distributing test and measurement instruments. We have a professional global service team to provide high-quality and efficient services.

    We will quote within 48 hours.

    It is one year warranty.

    Yes, we have professional engineers who can assist you.

    For non-stock products, the lead time is about 4-6weeks. For individual specialty products, the lead time is 6-8weeks after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.

    Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge.

    We have professional service team,we will keep update information about production/packing/shipping/delivery when you place an order.

    Customers Also Searched

    Professional supplier of gas cutting machines, pipe gas cutter, oxy-fuel cutting machines, CNC plasma cutting machine, welding rod oven, beveling machine and welding machines supplier in China.Here Are A Few Options You Can Use Alternatively.

    Get free quote

    Have a question? Get in touch instantly using the form below.
    Our customer support team would get back to you soon.

      Get Custom Quote